Bond reduction
Case Study - Section 104 Legacy Adoption
How JLES Exeter took on a complex S104 legacy scheme at Earl Richards Road as Principal Contractor, Main Contractor and the developer's Managing Agent.

How JLES Exeter took on a complex S104 legacy scheme at Earl Richards Road as Principal Contractor, Main Contractor and the developer's Managing Agent.
ÂŁ156k+
Bond reduction
6 months
Project duration
0 extras
100% fixed fee
40+
Resident liaisons
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.
Carriageway Resurfacing
Client: David Wilson Homes
Earl Richards Road, Exeter · South West Water adoption
South West Water had highlighted sewer issues that stopped this S104 legacy scheme reaching the maintenance stage. The fixes meant excavating the highway and residents' driveways, with extensive liaison with 40+ residents.
The development has only one entrance, so JLES engineers monitored traffic in and out continually. An adjacent dentistry school also needed planning and liaison so students could always get in.
All 40+ dig-down remedials were signed off instantly, resolving the issues South West Water raised and putting the scheme on the path to the maintenance certificate for David Wilson Homes. Residents and the neighbouring school kept access throughout, and the work came in at a fixed ÂŁ199,925.
Highway and property drainage remedials
Excavation of the highway and residents' properties to fix lateral drainage and main sewers: 40+ dig-down remedials, all signed off instantly.
Driveway reinstatement
Approx. 120m² of driveway surfacing, planned with residents to meet their requirements.
Water company and paperwork
Extensive liaison with the water company, plus consultancy and technical work to satisfy outstanding adoption documentation.
One accountable contractor
Principal Contractor, Main Contractor and Managing Agent, supervising the works throughout on a lump-sum fixed fee.
A driveway broken up by excavation, then reinstated to a new surface. About 120m² of driveway surfacing was completed.