Case Study - Section 104 Legacy Adoption

David Wilson Homes: 40+ sewer remedials signed off instantly in 3 months on a fixed-fee lump sum

How JLES Exeter took on a complex S104 legacy scheme at Earl Richards Road as Principal Contractor, Main Contractor and the developer's Managing Agent.

How JLES Exeter took on a complex S104 legacy scheme at Earl Richards Road as Principal Contractor, Main Contractor and the developer's Managing Agent.

ÂŁ156k+

Bond reduction

6 months

Project duration

0 extras

100% fixed fee

40+

Resident liaisons

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Carriageway Resurfacing

Client: David Wilson Homes

Earl Richards Road, Exeter · South West Water adoption

The challenge

South West Water had highlighted sewer issues that stopped this S104 legacy scheme reaching the maintenance stage. The fixes meant excavating the highway and residents' driveways, with extensive liaison with 40+ residents.

The development has only one entrance, so JLES engineers monitored traffic in and out continually. An adjacent dentistry school also needed planning and liaison so students could always get in.

The outcome

All 40+ dig-down remedials were signed off instantly, resolving the issues South West Water raised and putting the scheme on the path to the maintenance certificate for David Wilson Homes. Residents and the neighbouring school kept access throughout, and the work came in at a fixed ÂŁ199,925.

What we delivered

Highway and property drainage remedials

Excavation of the highway and residents' properties to fix lateral drainage and main sewers: 40+ dig-down remedials, all signed off instantly.

Driveway reinstatement

Approx. 120m² of driveway surfacing, planned with residents to meet their requirements.

Water company and paperwork

Extensive liaison with the water company, plus consultancy and technical work to satisfy outstanding adoption documentation.

One accountable contractor

Principal Contractor, Main Contractor and Managing Agent, supervising the works throughout on a lump-sum fixed fee.

See the difference

Road after the works Road before the works

A driveway broken up by excavation, then reinstated to a new surface. About 120m² of driveway surfacing was completed.