Bond reduction
Case Study - Section 104 Post-Build Adoption
How JLES took on the Section 104 adoption works and a bespoke highway programme at Biddenham East, Bedford as a specialist contractor, on a 100% fixed fee.

Carriageway resurfacing under way at Biddenham East, Bedford.
ÂŁ156k+
Bond reduction
6 months
Project duration
0 extras
100% fixed fee
40+
Resident liaisons
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.
Carriageway Resurfacing
Biddenham East, Bedford
Section 104 agreement · Bedford Borough Council
Biddenham East needed post-build adoption works to enable vesting of the sewers and approval of the highways. Outstanding items included damaged drainage lengths, manholes needing internal works, and a major spoke of highway remedial works requested by the adoption authorities, from carriageway resurfacing to kerbing and signage.
With a local school and a sizable resident population on site, ongoing communication was essential. JLES Thames kept all stakeholders informed through letters and updates on a dedicated local Facebook page, backed by careful planning and precise execution.
JLES acted as main contractor and managing agent, delivering the works and all consultancy and technical work for the adoption documentation on a fixed fee, lump sum agreement. The programme enabled Anglian Water to release the vesting certificate for the S104 agreement, with 0 extras charged to the client, in 3 months.
Sewer and manhole remediation
Excavations to replace damaged lengths, structural patch lining and internal manhole works, completed alongside Anglian Water to achieve adoption.
Carriageway resurfacing
Over 1600m² of carriageway resurfacing as part of the bespoke highway works programme requested by the adoption authorities
Highway remedials
Kerbing works, signage installation, highway drainage excavations and general maintenance works, with Bedford Borough Council liaised with throughout.
Adoption management and consultancy
JLES engineers managed all works and completed the consultancy and technical work to satisfy outstanding adoption documentation.
Regular contact maintained with a local school and 250+ residents throughout the works.