Case Study - Section 38 Legacy Adoption

Persimmon Homes: stalled legacy scheme completed in 4 months

How JLES South West took on the outstanding Section 38 legacy adoption works at Lakeside, Nantyglo, on a 100% fixed fee.

A 20-year-old legacy development taken from stalled adoption to a completed highway scheme.

ÂŁ156k+

Bond reduction

6 months

Project duration

0 extras

100% fixed fee

40+

Resident liaisons

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Carriageway Resurfacing

Client: Persimmon Homes

Lakeside, Nantyglo · Council Adoption

The challenge

The Lakeside legacy Section 38 development had remained stalled for a number of years. Following a Council inspection in April 2024, significant carriageway resurfacing and block paving replacement were required before the Council would consider adopting the assets, as the existing materials were approaching the end of their 20-year design life.

With a single access route, the works had to be phased in sections using three-way traffic lights, while 159 residential properties kept access to their homes and driveways were temporarily affected.

The outcome

JLES completed the required remedial works within 4 months, on schedule and on a 100% fixed fee. By negotiating with the Council, JLES also brought two additional areas into the adoption, removing ongoing maintenance and liability, and achieved a ÂŁ266,501 bond reduction for Persimmon Homes.

What we delivered

Carriageway and footpath resurfacing

6,600m² of full carriageway resurfacing and 3,900m² of footpath planing and resurfacing

Block paving replaced

1,000m² of carriageway block paving and 667m² of footpath block paving replaced, plus an additional 700m² of block paving and 120m² of surfacing included within the works.

Kerbs, drainage and ironwork

Kerb replacements, gully relocations, pipe replacements, and manhole and water box resetting, with traffic management and a defined pedestrian route maintaining safe access throughout.

Streetscape and added adoption areas

Obsolete bus stops, associated kerbs and raised footpaths removed, with tree pits and new trees installed to contain root growth. Two additional areas were negotiated into the adoption.

See the difference

Road after the works Road before the works

Carriageway resurfacing and block paving replacement helped move the Lakeside scheme towards adoption.