Bond reduction
Case Study - Section 38 & 104 Adoption
How JLES Northern finished the outstanding S38 & S104 agreements at High Banks, Silsden, on a fixed fee basis with zero extras.

The finished High Banks road network, adopted-standard surfacing throughout, with residents in their homes the whole time.
ÂŁ156k+
Bond reduction
6 months
Project duration
0 extras
100% fixed fee
40+
Resident liaisons
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.
Carriageway Resurfacing
Client: Harron Homes
High Banks, Silsden · Bradford Metropolitan Borough Council and Yorkshire Water adoption
Harron Homes needed the outstanding S104 and S38 agreements finished on an occupied estate. That meant sewer repairs up to 6 metres deep, road closures and temporary driveway restrictions for a large number of residents.
Adverse weather added pressure to a programme that had to end with sign-off from both Bradford Council and Yorkshire Water.
JLES secured the maintenance certificate from Bradford Metropolitan Borough Council and Yorkshire Water, releasing ÂŁ156,000+ of bond for Harron Homes. The project finished within 6 months on a 100% fixed fee, with no extra charges to the client.
6-metre deep excavations
to replace faulty drainage sections, planned and shored for safety and structural integrity.
Manhole and kerb repairs
including replacement chamber rings and damaged covers, with kerbs realigned across the entire site.
Complete final surfacing package
to bring the highways up to adoptable standards.
A resident liaison plan
with constant communication, plus traffic and pedestrian management to keep disruption low.
From patched, worn surfacing to a fully resurfaced, adoption-ready road, delivered alongside 6-metre drainage repairs.
.png)