Case Study - Section 104 Bespoke Works

Magenta Living: sewer adoption issues fixed on schedule, in occupied homes, with zero extras

How JLES delivered a fully managed Section 104 solution at Flambards, Birkenhead as the client's single point of contact, on a 100% fixed fee.

A private garden returfed and handed back in excellent condition after the sewer works.

ÂŁ156k+

Bond reduction

6 months

Project duration

0 extras

100% fixed fee

40+

Resident liaisons

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Carriageway Resurfacing

Client: Magenta Living

Flambards, Birkenhead · United Utilities adoption

The challenge

Flambards is an occupied residential development. Previously unidentified sewer issues had stopped the drainage network reaching an adoptable standard, and after discussions between Magenta Living and United Utilities, remedial works were needed.

Magenta Living wanted the burden taken off its own team. The works sat in residents' gardens, so safe access for residents, families and pets, and minimal disruption, were essential.

The outcome

The project was completed on schedule, and the drainage network reached the standard required for adoption. The fixed-fee agreement gave Magenta Living full commercial certainty, with no unexpected costs and nothing extra charged.

What we delivered

A fully managed solution

One point of contact managing Magenta Living, United Utilities and all stakeholders, combining technical delivery and resident liaison in a single package.

Sewer replacement

25m of sewer and associated manhole improvements, with excavations up to 2.2m deep in residential areas.

Resident care

Extensive liaison throughout, with safe access maintained for residents, families and pets during construction.

Full reinstatement

Carriageways, footways and private gardens reinstated, with affected gardens returfed.

See the difference

Road after the works Road before the works

Highway and sewer works delivered in stages, with final remedials completed before progressing to adoption.